The concrete team arrived at 5:30am to get the garage floor poured

Arriving at 5:30 am to beat the rain; this team poured the concrete floor in the garage.  

Sammy followed me around to the opposite side of the house from where Mike was standing.  When I decided to climb up to the sub-floor, Sammy got nervous and decided to make a run for it back to Mike..... ACROSS the newly smoothed over concrete.…

Sammy followed me around to the opposite side of the house from where Mike was standing.  When I decided to climb up to the sub-floor, Sammy got nervous and decided to make a run for it back to Mike..... ACROSS the newly smoothed over concrete.  The guy in the concrete truck was rolling over in laughter, but not the guys working so hard to smooth the floor.  So Sammy and I decided to leave, our help no longer needed.